The failure to pay for or repair the damage immediately was a breach, and, as a result of the breach, Ace incurred the proper mitigation expense of beginning to repair the damage to the house. To put Ace in as good a position as it would have been in had Bulldozer not breached, a court must award the repair expense under the expectation measure.